The clearing process was advancing with necessary speed. All of the walls had been dominated by ivy and swift action was taken to halt the decay. We had been informed that the party wall was a ‘heated wall’ but didn’t really understand how it actually worked. The building attached to the lower end may have been the boiler house but, if that was so, how would you get a constant temperature throughout the 100m long wall?